Earthworks and pavements | Hot and cold block buildings | Foundation of water tanks and silos | Cistern | Empty/full packing buildings | Racks
PROJECT NAVE 5 SOFTLINE LIVERPOOL
CLIENT | LIVERPOOL
TIME FRAME | 2022
Turn-key project | CEDIS 180,000 M2 | external areas and services
PROJECT EL CHARCON ELEVATE - II
CLIENT | GRUPO DIAGEO
TIME FRAME | 2022
GENERAL CONTRACTOR Foundation construction | Civil works | Slope stabilization | Fabrication and Erection of steel structure for production buildings and tanks | Installations.
PROJECT STAAR
CLIENT | HOLCIM
TIME FRAME | 2017 - 2018
Civil works | Steel structure | Rigging | Electrical installation.
PROJECT CENTRO
CLIENT | ABINBEV/GRUPO MODELO
TIME FRAME | 2017 - 2018
Earthworks | Urbanization and drainage | Fabrication and erection of production buildings | Services | Warehouses and workshops, including electrical, hydraulic, and sanitary installations | HVAC | Fire Protection System | Special Facilities